LIMES Management Report
Partner: UJF/MDC
Reporting Period: October - December 2000
From: Pierre Bérard
E-mail: Pierre.Berard@ujf-grenoble.fr
Telephone: +33 47663 5636
Fax: +33 47663 5611
---------------------------------------------------------------
Note: CG = Claude Goutorbe, EC = Elizabeth Cherhal, LG = Laurent
Guillopé, PB = Pierre Bérard
Work Carried Out:
WP-0: Project Management
Partners: All
Work done:
Participation in Athens meeting [PB, CG, LG].
Work on consortium agreement (Comments on MathDoc Cell server)
[PB].
Local management (monthly and 3-month management report)[PB].
Estimated achievement:
+ 5%
-----------------------------------
WP-1: Quality of Data and Retrieval
Partners: FIZ, UJF, Eidetica, TUB; responsible: FIZ
T1.1: System requirements analysis and specifications
D1.1: System Specifications (due September 2000)
Work done:
T1.1:
- Preparation of Athens meeting
- Development of edbm/indexer module (a test version should be
available by April 2001). Details on current status of
development described in Goutorbe's message into AC-mailing
list (message dated 2001 Jan 23).
- Design of identification tool of serials for the interface
(similar to MSC browser) ; a demo version (based on the partial
list of serials received by MDC) should hopefully be available
by april 2001. Will serve as specifications.
- Comments to MSC browser taken into account --> new version of
MSC browser (see demo version available on MDC server).
Comments to come on AC-mailing list.
This MSC should be available on the international mirrors
in April 2001.
Above items : work done by [CG] + internal discussions with [PB, LG]
D1.1:
- Specifications for updates: not yet available et should be
discussed at the Amsterdam meeting of the Architecture Committee
(no comments received by MDC on document posted earlier, see
Athens meeting minutes).
------------
T1.2: Implementation of alpha versions
D1.2: Alpha versions incl. documentation
Work done:
- MSC browser (modified) demo version available on MDC
server ==> final specifications.
Estimated achievement:
+ 5%
-----------------------------------
WP-2: National Access Nodes
Partners: FIZ, UJF, HMS, USDC, TUB, responsible: FIZ
T2.1: Investigation of location, distribution and needs
of potential users
D2.1: Report on national user community
(due September 2000)
Work done:
Already done
Estimated achievement:
------------
T2.2: Basic installation of national access nodes
D2.2: National access nodes (due September 2000)
Work done:
- Modifications on mirrors, update procedure and identification of
users
- Preparation of Athens meeting
Work done by [CG, LG, PB]
Estimated achievement:
+5%
------------
T2.3: Incremental development of update procedures
D2.3: Update procedures including. Documentation
Work done:
- No comments received on document posted on MDC server since
June. Will be discussed in Amsterdam.
Estimated achievement:
------------
T2.4: Extending the visibility and usability of the database
D2.4: Report on enhanced visibility, accessibility and usability
Work done:
Estimated achievement:
------------
T2.5: Integration with other national offers,
network structure for information in mathematics
D2.5: Integration with other national offers (service and report)
Work done:
Estimated achievement:
-----------------------------------
WP-3: Distributed Editorial Units
Partners: FIZ, UJF, DTV, SIBA-UNILE, TUB; responsible: FIZ
T3.1: Internal workshop on reviewing standards, policies,
and editorial operations.
D3.1: Workshop report (due September 2000)
Work done:
Estimated achievement:
------------
T3.2: Decision procedures for selection of sources.
Selection of national sources to cover.
D3.2: List of sources including description of
contents and coverag (due September 2000)
Work done:
Estimated achievement:
------------
T3.3: Installation and set up of basic technical functions for
input procedures, start of input delivery
D3.3: Input environment including documentation
Work done: New procedures for transmission of bibliographic data
from editors (SMF and EDPScience) into ZM Database (conversion
from editor format to ZM format) [LG]
Estimated achievement: 5%
-----------------------------------
WP-4: Information Dissemination and Concertation
Partners: FIZ, Eidetica, DTV, SIBA-UNILE, HMS, USDC, TUB; responsible: TUB
T4.1: Public project WWW-server with project information
and public reports and Deliverables
D4.1: Public project WWW server (updated during the
whole duration of the project)
(due March 2004)
Work done:
Estimated achievement:
------------
T4.2: Periodical dissemination of information from the
project; Concertation events.
D4.2: List of publications and presentations at events
and workshops (due March 2004)
Work done:
Estimated achievement:
---------------------------------------------------------------
Project meetings attended:
Athens meeting [PB, CG, LG]
-----------------------------------
Problems:
Issue description: No feed back at all on update mechanism
although strongly requested at the Athens meeting.
Red Flag:
Deviations from Plan:
-----------------------------------
Other Comment:
---------------------------------------------------------------
Costed Labour Resources:
WP-0: Project Management
Partners: All
Staff Category: Effort in hours
E= engineer, S = scientist
E = 2 p/h
S = 22 p/h
WP-1: Quality of Data and Retrieval
Partners: FIZ, UJF, Eidetica, TUB
Staff Category: Effort in hours
E= engineer, S = scientist
E = 350 p/h
S = 50 p/h
WP-2: National Access Nodes
Partners: FIZ, UJF, HMS, USDC, TUB
Staff Category: Effort in hours
E= engineer, S = scientist
E = 12 p/h
S = 12 p/h
WP-3: Distributed Editorial Units
Partners: FIZ, UJF, DTV, SIBA-UNILE, TUB
Staff Category: Effort in hours
E= engineer, S = scientist
E = 0 p/h
S = 5 p/h
WP-4: Information Dissemination and Concertation
Partners: FIZ, Eidetica, DTV, SIBA-UNILE, HMS, USDC, TUB
Staff Category: Effort in hours
E= engineer, S = scientist
E = 0 p/h
S = 0 p/h
---------------------------------------------------------------
Total WP1--WP4
E = 364 p/h
S = 89 p/h
Total : 453 p/h